Inchgarth Pumping Station
Client: Balfour Beatty Civil Engineering
Scope of work: LB installed a temporary cofferdam to assist Balfour Beatty to access the main raw water intakes within the floor of the River Dee to allow them to carry out upgrading works to the intake screens.
The sheet pile installation work were carried out afloat from a modular barge working within the River Dee under stringent environmental conditions.
Hamilton Technology Park
Client: ROK then Balfour Beatty Construction
Scope of work: Permanent Ground Retention installed at Hamilton Technology Park initially for ROK then for Balfour Beatty Construction.
Griffin Wind Farm
Client: Luddon Construction
Scope of work: Luddon Construction – Griffin Wind Farm
Installation of sheet piles using side grip
vibrating hammer adjacent to railway bridge